Ongoing Works to Enhance the Electricity System
06.03.2024
Works are in progress as we are currently laying more 11-kilovolt , underground cables in the areas of Xgħajra as well as Ta’ Qali.
Enemalta is reinforcing the electricity distribution system in the localities of Mtarfa, Rabat, Dingli, Mosta, Żabbar, and the surrounding areas.
Due to these works, Triq Vnzja (The road in front of the Aviation Museum) in Mosta will be closed during these works.
Follow diversion signs towards nearby streets in the area https://bit.ly/TaQali11kV
Thank you for your cooperation